|
|||||||||||||||||||||||||||||||||||||||||||
Dive
Number: 3493
December
2, 2003
| Pilot:
Tony
Tarantino Port Observer: Dr. George Luther Starboard Observer: Liz McCliment |

|
1404 Sub in the water. Sipper check @ 1400 meters everything okay. DLK check @ 1800 meters error “serial port timed out” message recorded. 1527 Sub reaches bottom 4361 X 78081 landed in collapse @ 2502 meters. 1535 Began searching for major pair lost on previous cruise 4374 X 78048, 2503 no luck. 1537 Turned off sub power to DLK. 1603 Began direct transit to elevator holding LVWS (Eric Wommack’s Large Volume Water Sampler). 1605 Found elevator in hole ~ 4537 X 78342, 2513 heading 142. 1615 Heading to ASC to set unit down for repositioning, removed one weight. 1630 DLK talk with surface re: error message. 1638 Began moving elevator: 4514 X 78324 heading 128 (transit). 1655 In transit, 4550 X 78559, 2509 m observed giant field of serpulid worms. 1705 Deploying LVWS at “Mussel Bed” site: began temp probing of area – noticed shimmering water in hole this is where we will deploy. 1720 Deploying LVWS nozzle at shimmer near mussels: 4578 X 18549, 2503 m 1723 Pumping Sipper @ 5.9° 6.4°C Sipper 2 1737 Changed tapes to #2. 1752 Began pumping LVWS (problem with positioning: was not clear which position was "purge" and which was "pump" from our angle must specify in dive plan). 1754 Transiting to Q vent for Alvinella collection (320 M, 334 range and bearing from elevator site). 1803 Securing DLK still not responding serial port time out error. 1810 Arrive @ Q vent: Western spire 4438 X 78827, 2506 alt 5.8 m. 1825 Pumping Sipper 1826 Sipper (tube) 1: 31-38°C 1829 Sipper (tube) 3: 31-54°C 1832 Sipper (tube) 4: 27-29°C 1834 Sipper (tube) 5: 77-126° C (probe may have touched chimney on this one). 1835 Deploying slurp pump to catch Alvinella for Artie (RNA later) chambers. 1835 Slurp 1 1852 Slurp 2 1854 Slurp 3 1856 Slurp 4 1857 4 worms in chamber one. Pumping RNA later successful. 1910 Began slurping for worms for chamber 3. 1910 Slurp 1 1915 Slurp 2 1917 Slurp 3 1920 Slurp 4/5 1924 3-4 worms in chamber three pumping took ~60 seconds, total. 1926 Sampling large Alvinella clump for forward biobox chamber. 1932 Spotted small beehive chimney just above Alvinella colonies 130–303°C effluent temperatures Sipper 6 @ 294°C (270-301). 1942 Collected small chimney stored in small, grey biobox. 1944 In chimney scar: Sipper 7 @ 140-228°C Sipper 8 @ 234°C. 1949 Trying to position chamber (fry pan) 4437 X 78827, 6.4 meters altitude. 1955 No good, piece broke off & ledge unstable attempts to carve out flattened edge also fail as entire structure seems friable and unstable. 1957 Changed tapes to #3. 2002 Set up at new site on Q: 4435 X 78824, 2504 heading 054 small beehive with temp of 193°C. 2005 Lost chimney, very friable, not stable for placement @ Q vent. 2009 Leaving Q, returning to elevator (LVWS). 2031 At LVWS, digital images taken: plunger is in crevice, lots of shimmer. 2038 Pump off, elevator secured, nozzle retrieved. 2039 Elevator released. 2045 Sipper 9 @ 5.6°C from LVWS nozzle location. 2049 Transiting to Tika, main clump, to retrieve Cavanaugh’s “Fries” samplers #28 and #30. 2104 Spotted Tika 4604 X 78227, 2509 m depth saw low vents near tubeworms looks good for future ASU fry pan deployments. 2107 Sighted Fries #28/#30 and collected both into aft biobox. 2114 Cleared for surface after being advised to look for lost major pair. 2122 Weights away no majors. Summary:
9 sipper samples |
| Copyright University of Delaware, November 2003 |